Western Line Upgrade: Mira Road Station Complete by 2025

A digital rendering of the revamped Mira Road Railway Station. The image shows a modern, wide platform with a new train, large glass-covered Foot Over Bridge (FOB), and commuters using multiple escalators and stairs. Key text overlays are "₹90 Crore Project" and icons highlighting Wider Platforms, Escalators & Lifts, Metro Connectivity, and December 2025 completion.

The daily hustle of a Mumbai local train commuter is about to receive a major upgrade! For the lakhs of residents who rely on the Western Line, the news offers a true breath of fresh air: The Mumbai Rail Vikas Corporation (MRVC) is executing a massive ₹90 crore redevelopment project at Mira Road Railway Station, aiming for a completion date of December 2025.

To be clear, the project involves more than just a fresh coat of paint; instead, MRVC is delivering a complete transformation that will significantly improve safety, efficiency, and the overall commuting experience for everyone.


Decoding the ₹90 Crore Makeover: From Congestion to Convenience

The redevelopment, led by the MRVC under MUTP-3A, tackles the station’s massive daily footfall of over 1.3 lakh passengers. The project uses innovative vertical and horizontal expansion to deliver several game-changing features:

1. Platform Expansion for Decongestion

  • Wider Platforms: Crucially, the most important change is the widening of Platform No. 1 from the existing 6 meters to a spacious 10 meters. This four-meter expansion will therefore significantly reduce the chaotic “super dense crush load” during peak hours, creating a safer boarding and alighting experience.
  • Elevated Deck: Furthermore, a key element of the vertical expansion is the construction of a 240-meter-long and 10.50-meter-wide elevated deck over Platform No. 1. This deck will act as a separate concourse, thus allowing passengers to move above the main platform area, which is vital for quick dispersal.

2. The City’s Widest East-West Connectivity

  • Mega Foot Over Bridge (FOB): In addition, the station will feature one of the widest Foot Over Bridges (FOBs) in the entire Mumbai suburban section, boasting a width of up to 23 meters. This massive FOB, coupled with a proposed 10-meter-wide bridge with triple discharge points, will ensure rapid movement of commuters across the East and West sides.
  • Escalators and Lifts: Accessibility is a top priority. Consequently, the plan includes the installation of five new escalators and three lifts to connect the platforms, decks, and FOBs, making the station fully accessible for senior citizens and Persons with Disabilities (PwD).

3. Modern Facilities and Better Operations

  • New Station Offices: First, to free up platform space and streamline operations, the existing elevated booking office and other railway service buildings will be relocated to the new elevated decks. This means new office spaces for the station manager, deputy station manager, and a rest house will also be constructed.
  • Improved Lighting and Signage: Finally, general lighting will be upgraded with energy-efficient systems, and enhanced indicators and signage will improve passenger navigation across the revamped, multi-level station complex.

Mira Road: A Hub of Multi-Modal Transport

It’s important to note that this railway station upgrade is not an isolated project; rather, it is part of a larger plan to transform Mira Road into a powerhouse of integrated transport:

  • Seamless Metro Connection: The railway station upgrade will perfectly complement the forthcoming Metro Line 9 (Dahisar East to Mira Bhayandar), with the new Kashigaon Metro station located a short distance away. Together, the Metro and the revamped railway station will offer commuters unprecedented choices for faster and more reliable travel.
  • Boost to Real Estate: As expected, the commitment to such large-scale public infrastructure has already had a positive impact on the local real estate market. The improved connectivity and superior station amenities are driving property appreciation and increased demand, thereby cementing Mira Road’s status as a prime residential hub in the MMR.

The ₹90 crore investment shows the railway authorities’ strong commitment to commuters. Despite limited night-time work, the project moves forward, promising a new era of comfortable, efficient, and safe travel on the Western Line by December 2025.

Which feature—the wider platform, new escalators, or the wide FOB—do you think will make the biggest difference to your daily journey? Share your thoughts.

2BHK Flat | Northern Hills | N Rose Developers | Dahisar | #2bhk #flat #northernhills

Under Construction Affordable 1&2 bhk Apartment at Vinay Nagar

Join The Discussion